(518) 872-6633

Germantown, New York

Don’t replace it, reface it.

Countertops, showers, epoxy floors and concrete repair across the Hudson Valley and Capital Region. Let’s make the rooms you live in feel beautiful again.

Send a note
Chris, owner at 518 Coatings
“I’ll come out and look at it myself.”— Chris, owner · Fully insured

Our products were designed around 20+ years of real-world application.

Popular Shower Flake Colors

Popular Countertop Colors

Why 518 Coatings

Most recent install

After, countertop
Before, countertop
BeforeAfter

Matte white marble epoxy countertop over old Formica — Germantown. Full use in 7 days.

What we install

This is the work we are taking on. We will say what fits once we see the space.

  • Floors

    • Flake Floor

      A full-broadcast flake floor. The concrete gets a primer, a clear epoxy coat, flakes thrown until the floor looks full, and a clear topcoat. An extra urethane coat is optional.

    • Metallic Epoxy

      A poured metallic floor. A dark primer, a colored metallic base, design highlights, then a urethane topcoat.

    • Solid Color Epoxy

      A single-color epoxy floor built from clear epoxy and a solid pigment, then a urethane topcoat.

  • Countertops

    • Concrete Overlay Countertop

      A cement overlay for a countertop: primer, texture coats, a scratch coat, and urethane.

    • Epoxy Countertop, Standard

      An epoxy countertop: primer, a metallic base coat, and a urethane topcoat.

    • Epoxy Countertop, Exotic & Stone

      An epoxy countertop poured thicker for an exotic or stone look, then a urethane topcoat.

  • Showers

    • Flake Shower

      Flakes in a shower: a paste base, flake broadcasts, and clear topcoats.

  • Repair

    • Concrete Repair

      The concrete is pressure-washed, deep pits are filled, texture coats go down, and a sealer finishes the surface.

    • Asphalt Repair

      The asphalt is pressure-washed, a black texture coat goes down, and a black sealer finishes the surface.

Finished white marble-look epoxy countertop with navy cabinets and stainless sink
Finished epoxy countertop

Service area

Based in Germantown, New York. We serve the Hudson Valley and Capital Region, from Albany down to Poughkeepsie.

What to expect

A short version of how a job goes, from the day we arrive through the cure.

Full use is 7 days after the last coat.

These are typical times after the last coat, based on about 70–77°F.

  • Flake floors

    Vehicles and full use

    7 days

  • Metallic and solid color epoxy

    Vehicles and furniture

    7 days

  • Epoxy countertops

    Heavy items and hot pans (on a trivet)

    7 days

  • Shower walls

    Water

    7 days

  • Concrete repair

    Vehicles

    7 days

  • Asphalt repair

    Parking

    7 days

Walk and light use
  • Flake floors

    Walk: 36 hours

  • Metallic and solid color epoxy

    Walk: 48 hours

  • Epoxy countertops

    Light use and water: 48 hours

  • Shower walls

    Touch: 36 hours

  • Concrete repair

    Walk: 24 hours

  • Asphalt repair

    Walk: 24 hours

Arrival

We give you a 2-hour arrival window, not an exact time. If we can't keep that window for any reason, we'll call or text you before it closes.

How the days go

Coatings run on cure times, so late-morning starts on coat days and short visits are normal. Temperature and humidity set the pace.

  • The day before each work day, we email that 2-hour window. Cure times and drive time move through the day, so a window is more honest than a promise to the minute.
  • If yesterday's coat needs another couple of hours, we wait. Some coats must go on within about 2 hours of the one before. Others sit overnight and get covered within about 24 hours. Too early or too late can hurt the finish.
  • A quiet gap is part of the job. We may leave mid-day and come back, or a day may be only a short visit. That is the coating curing.
What we need from you
  • Clear the area
  • Keep pets and kids out
  • Power and water ready
  • Take everything off the floor, including shelves, bins, bikes, and anything on the lower walls. For countertops, clear the counters and the cabinets under them. For showers, remove bottles, caddies, and mats. Tell us before the first work day if something can't be moved.
  • Park vehicles out of the work area and leave room for our equipment. Keep vehicles off a driveway or concrete repair until we say it's ready.
  • We need a working outlet near the work and access to water, such as an outdoor spigot or a utility sink. Tell us if a breaker trips easily.
  • Keep the space at a normal room temperature before the job and through the cure. In cold months we may set up heaters a day ahead. We'll talk with you about it first.
  • Keep pets and kids out for the whole project and the cure. Wet coatings can be harmful, and paw prints and pet hair don't come out of a fresh finish.
  • An adult (18 or older) should be home at the start of each work day, or be reachable by phone. For outdoor work, turn off sprinklers that hit the area the day before, the day of, and the day after.
  • You won't be able to use the area during the job and the cure. Plan ahead for parking, cooking, or showering.
How we'll communicate

Confirmations, reminders, and a day-before note come by email. Your full What to Expect sheet comes by email once you book.

Cold weather and your care sheet

Cold weather can make cures take up to twice as long. We'll tell you if your timeline changes. The exact times for your job are on your care sheet.

Tell us about the project

A name, a way to reach you, and the town are enough to start. Photos help, and they stay private.

Project type

No-cost on-site estimates. No obligation.